Preparation at a glance
- Confirm the exact show edition, venue, hall, stand number and plan.
- Use the current official manual and service portal, not a previous edition.
- Separate contractor scope from organizer approvals and mandatory venue services.
- Keep decisions, exclusions, versions and owners visible across time zones.
1. Confirm the official project baseline
Start with the organizer confirmation or exhibitor account. Record the official show name, edition, venue, hall, stand number, stand dimensions and open sides. Download the current exhibitor manual, technical guidelines and service information. If any of these items are missing, mark the project as provisional rather than filling gaps with assumptions.
Germany hosts many international trade fairs, but there is no single rulebook that applies to every show. AUMA provides a useful overview of exhibiting in Germany; binding requirements still come from the specific organizer, venue and current event documents.
Sources for this section: [1]
2. Build a booth brief that a local team can execute
A useful brief connects business goals with physical requirements. State who should visit the booth, what they should understand or do, which products must be shown and how the team will use the space. Add brand files, required screens or equipment, meeting needs, storage, accessibility considerations, budget scope and the decision process.
Avoid asking for a visual concept before confirming the stand plan and known restrictions. Early images based on the wrong dimensions or hall conditions create rework. A clear brief also distinguishes must-have functions from preferences that can change during design.
- Show, city, dates, hall, stand number and plan
- Audience, message and desired visitor action
- Products, demonstrations and technical interfaces
- Brand assets, functions, budget scope and approvers
- Current organizer and venue documents
3. Define local coordination and official responsibilities
A local project team can coordinate design, production, logistics interfaces and on-site handover. It may also help prepare technical material or communicate questions. That support does not transfer the authority to approve a stand, allocate space, waive a rule or change an official deadline.
Create a responsibility matrix for every deliverable: who prepares it, who checks it, who submits it, who receives the decision and who pays the related fee. The same distinction applies to official services such as electricity, rigging, internet, security or material handling.
Sources for this section: [2]
4. Control versions across language and time zones
International projects often fail through version drift rather than a lack of effort. Use one approved plan number, one decision log and one list of open items. Record changes to graphics, materials, equipment and quantities with their cost and timing impact. Informal chat messages should be transferred into the project record when they change scope.
For bilingual communication, translate operational meaning rather than isolated words. Technical terms, units, product names and responsibilities should remain consistent in the brief, drawings, quotations and handover checklist.
5. Prepare build, inspection and handover
Before dispatch, compare the approved design with production status, logistics bookings, hall access, official orders and the on-site contact list. Identify what can be tested before shipping and what can only be checked in the hall. Leave time for recorded corrections without promising that every third-party issue can be resolved by the contractor.
At handover, inspect graphics, finishes, lighting, power, media, furniture, storage and agreed functions. Photograph open items, assign an owner and record status. Handover evidence confirms what was observed at that point; it does not establish visitor results or commercial return.
International exhibitor responsibility matrix
| Workstream | Exhibitor provides | Local team coordinates | Authority remains with |
|---|---|---|---|
| Stand baseline | Official confirmation and plan | Completeness check | Organizer |
| Booth brief | Goals, products, brand, budget | Design translation | Exhibitor approver |
| Technical submission | Required company data | Document preparation / interface | Organizer or venue reviewer |
| Venue services | Need and authorization | Schedule and interface | Venue / nominated provider |
| Handover | Authorized recipient | Inspection and open-item record | Agreed contract parties |
Questions international exhibitors ask
Is there one document list for every German trade fair?
No. Required documents, formats, portals and review conditions can differ by event, venue and stand type. Always use the current official documents for the exact show edition.
Can Exhibit Germany guarantee organizer approval?
No. A project team can prepare and coordinate material, but the relevant organizer, venue or reviewer decides whether a submission is accepted.
How early should we start?
There is no universal number of weeks or months. Work backwards from the current official submission, service-order, logistics and access deadlines for your show.
Does an English or Chinese page prove on-site language availability?
No. Website language and project staffing are different matters. Confirm the required communication and interpreting support in the written project scope.
Scope and limitations
This guide is a project-planning aid, not an official organizer notice or legal, customs, tax, fire-safety, engineering or logistics advice. Dates, technical rules, applications and approvals must be verified in current official sources. Services, price and timing only apply when confirmed in writing for the specific project.
Primary sources
Start with a complete booth brief
Send the stand plan, current organizer documents and your functional requirements. We will separate project scope, missing information and official dependencies before proposing next steps.
Send your booth brief →